Ruyang Dongyangguang 30 m³/h Water Reuse: Process Design and Results

Ruyang Dongyangguang 30 m³/h Water Reuse: Process Design and Results
WTEYA completed a 30 m³/h industrial water reuse system for Ruyang Dongyangguang Fluororesin Co., Ltd. in Guangdong Province. The project recycles production washing water containing dispersants, sulfates and diethyl malonate, achieving a total recovery rate above 65% with high-purity effluent for reuse.
Project Background and Water Quality
The fluororesin production line generates washing water with residual PVDF particles and dissolved organics. After plate-frame filter pressing, this water enters the reuse system as raw feed. The design target requires effluent conductivity below 5 μS/cm and TOC below 5 mg/L, suitable for washing post-treatment materials.
Three-Stage Process Design
The system follows a mechanical filtration, ultrafiltration and two-stage reverse osmosis configuration:
Pre-treatment: Raw water passes through a 200 μm self-cleaning filter followed by a 100 μm bag filter, removing residual PVDF particles and suspended solids to protect downstream membranes.
Ultrafiltration: The UF system achieves an effective recovery rate of 93%, with UF concentrate discharged to the plant wastewater system. A backwash and CEB chemical cleaning system extends membrane life.
Two-stage reverse osmosis: Each RO stage is protected by UV sterilization and 5 μm precision filters. The first-stage RO uses a high-pressure pump with two-pass membrane and internal circulation, reaching 75% recovery. The second-stage RO operates at 86% recovery, producing water that meets reuse standards.

System Highlights
Chemical cleaning systems are provided for both UF and RO, along with a UF CEB cleaning unit, oxidizing biocide dosing, reducing agent dosing and pH adjustment with sodium hydroxide. These automation systems ensure stable long-term operation with minimal operator intervention.
Results and Environmental Impact
The system delivers total production above 20.1 m³/h with effluent conductivity below 5 μS/cm and TOC below 5 mg/L. With overall recovery above 65%, the project significantly reduces fresh water consumption and wastewater discharge for the fluororesin plant, supporting sustainable manufacturing.

Frequently Asked Questions
Q: How to choose the right solution?
A: Consider your industry, capacity requirements, and environmental regulations. Contact WTEYA for expert guidance.
Q: What is the typical project timeline?
A: Project timelines vary based on capacity and complexity. WTEYA provides detailed project schedules during consultation.
Transform Your Wastewater Management
Don't let wastewater challenges hold back your operations. WTEYA has helped 100+ manufacturers achieve compliance and reduce costs by up to 50%.
Request your free technical assessment and discover how we can optimize your your industry process.
📱 WhatsApp: +86-1800 2840 855
✉ Email: info@vteya.com
🌐 Website: www.vteya.com
Guangdong WTEYA Environmental Technology Co., Ltd
Contact us
WhatsApp: +86 1800 2840 855
Tel: +86-0769-28636053
+86-0769-28636126
Email: info@wteya.com
Add: Floor 14, F4 building, TianAn digital town,
Nancheng District, Dongguan,Guangdong, China

